Terminal 1 Kerb — Kempegowda International Airport
Kerbside works at Terminal 1, Kempegowda International Airport, Bengaluru — carried out by Vemula Groups while the terminal stayed open to passengers.
About the project
Vemula Groups carried out kerbside works at Terminal 1 of Kempegowda International Airport, Bengaluru — the arrival and drop-off edge where passengers first meet the terminal.
Full project details and photographs will be added to this page soon. To know more, or to plan something similar, send us an enquiry.
Photographs
Planning works at an airport or campus?
We deliver in live, operational spaces — tell us the scope and we’ll set out how we’d do it.
More airport work
All projects
Terminal 1 LoungeConstruction and interior fit-out of a calm passenger lounge — warm materials, acoustic comfort and airport-grade detailing.Ongoing
Terminal 1 Special Assistance ZoneDedicated check-in, bag drop and seating for passengers who need extra support, with direct access from Priority Gate 5A.
Terminal 2 Green WallSpecialist execution of the Patrick Blanc–designed living green wall at Terminal 2.
Terminal 2 Kids Play Area — “Flight”An aviation-themed soft-play area with a miniature aircraft, runway and cloud forms for young travellers. 